project specification contractor

  • 1Specification (technical standard) — Specification redirects here. For other uses, see Specification (disambiguation). A specification (often abbreviated as spec) is an explicit set of requirements to be satisfied by a material, product, or service.[1] Should a material, product or… …

    Wikipedia

  • 2Project management — is the discipline of planning, organizing, securing, and managing resources to achieve specific goals. A project is a temporary endeavor with a defined beginning and end (usually time constrained, and often constrained by funding or deliverables) …

    Wikipedia

  • 3Project finance — is the financing of long term infrastructure and industrial projects based upon a complex financial structure where project debt and equity are used to finance the project. Usually, a project financing scheme involves a number of equity investors …

    Wikipedia

  • 4General contractor — A general contractor is responsible for the day to day oversight of the construction site, management of vendors and trades, and keeping communication between the involved parties open and clear throughout the course of a project.[1] A general… …

    Wikipedia

  • 5to specification — to specification(s) also INFORMAL to spec(s)) ► if a product is made to specification, it is made exactly as the person who designed it said it should be made: »If the project is completed on time to specification the contractor will realize a… …

    Financial and business terms

  • 6National Building Specification — The National Building Specification, and now known as the NBS, is a British based system of construction specification used by architects and other building professionals to describe the materials, standards and workmanship of a construction… …

    Wikipedia

  • 7Reflection seismology — (or seismic reflection) is a method of exploration geophysics that uses the principles of seismology to estimate the properties of the Earth s subsurface from reflected seismic waves. The method requires a controlled seismic source of energy,… …

    Wikipedia

  • 8ГОСТ 31301-2005: Шум. Планирование мероприятий по управлению шумом установок и производств, работающих под открытым небом — Терминология ГОСТ 31301 2005: Шум. Планирование мероприятий по управлению шумом установок и производств, работающих под открытым небом оригинал документа: 3.2.7 звуковая иммиссия (noise immission): Шум от всех источников на данном месте.… …

    Словарь-справочник терминов нормативно-технической документации

  • 9Submittals (construction) — Submittals in Construction Management are shop drawings, material data, and samples. Product data submittals, samples, and shop drawings are required primarily for the architect and engineer to verify that the correct products will be installed… …

    Wikipedia

  • 10New-construction building commissioning — Building commissioning is the process of verifying, in new construction, that all the subsystems for HVAC, plumbing, electrical, fire/life safety, building envelopes, interior systems (example laboratory units), cogeneration, utility plants,… …

    Wikipedia