overhaul time

  • 71USS Triton (SSRN-586) — USS Triton (SSRN/SSN 586), a U.S. Navy nuclear powered radar picket submarine, was the first vessel to execute a submerged circumnavigation of the Earth, accomplishing this during her shakedown cruise in early 1960. She also has the distinction… …

    Wikipedia

  • 72USS Volador (SS-490) — USS Volador (SS 490), a sclass|Tench|submarine, was the second ship of the United States Navy to be named for the volador, one of several varieties of flying or sailing fishes named for a Spanish language term meaning flying .The contract to… …

    Wikipedia

  • 73USS Berkeley (DDG-15) — Career (United States) …

    Wikipedia

  • 74USS Tautog (SSN-639) — For other ships of the same name, see USS Tautog. USS Tautog (SSN 639) off the Hawaiian Islands. Career (United States) …

    Wikipedia

  • 75Churnet Valley Railway — Churnet Valley Railway …

    Wikipedia

  • 76Port Authority of Allegheny County — Not to be confused with Port of Pittsburgh Commission. For other uses, see PAT (disambiguation). Port Authority of Allegheny County …

    Wikipedia

  • 77USS Ajax (AR-6) — was the second Vulcan class repair ship and the fourth ship in the United States Navy to bear the name. 1941 1945 Ajax was laid down on 7 May 1941 at San Pedro, Calif., by the Los Angeles Shipbuilding and Drydock Corp., launched on 22 August… …

    Wikipedia

  • 78USS Walker (DD-517) — USS Walker (DD 517), a Fletcher class destroyer, was the second ship of the United States Navy to be named for Admiral John Grimes Walker (1835 ndash;1907). Walker was laid down on 31 August 1942 by the Bath Iron Works Corp., Bath, Maine;… …

    Wikipedia

  • 79USS Southerland (DD-743) — Career (USA) …

    Wikipedia

  • 80NZR KA class — A streamlined KA class locomotive Power type Steam Builder NZR Hutt Workshops Build date 1939 1945, 1950 …

    Wikipedia